Author Message
a4bimi6o
PostPosted: 07    Post subject:

| Back to logs list

Reprinted from 495807266 at 11:18 on May 2, 2010 Reading (loading. ..) Comments (0) Category: Photo


| Back to logs list
mv3uxa6150
PostPosted: 20    Post subject: Rural households are more than 20 million owed ​&a

sign the agreement with the township government building the road construction contract to by him in April 1996 to June 10 period, more than 10 villages for the construction of township roads village of more than 8600 meters, road width ranging from 3.5 to 10 meters per square meter costs are 17.5 yuan, a total of 3.6 million square meters, the total cost of 63.4 million yuan. Road repair schedule, the township government acceptance of the king even after several payments has 39.88 million yuan, leaving a shortfall of 23.5 million yuan.

hearing yesterday morning newspaper Puyang, Qingfeng Yuan Dianqi called farmers,ghd straighteners, told reporters that 14 years ago,cheap ghd straighteners, he loans to several hundred thousand dollars, even for the town more than 10 Qingfeng Wang villages of more than 8,600-meter-long repair of the Because part of the project has yet to get the money, he has become a veritable poor households.




years, Yuan Dianqi door to ask several times each year, but the king of township government are even money on the grounds prevarication. In 2006, Wang Qingfeng County town even to merge high-tech zone of Puyang City, Hu Village, the payment due to repay the government transferred to the Juan Village. After the Yuan Dianqi bombarded several times, beginning in 2007, Hu Village Government every year to repay a certain amount of arrears, but the meager amount, and even interest rates are not enough, usually only has a few thousand dollars a year. The least of which is a reimbursement by the Government earlier this year, Hu Village 300 million, dumbfounding.
for projects dragging on for 14 years, was dragged into a poor household
Hu Village High-tech Zone, Puyang City, one official said the government, this is the original king of the road construction even outstanding legacy of town,ghd UK, although the debt to repay the government handed over to Hu Village, but Hu Village Township government financial resources are limited, only the funding from the hard part out of funds to repay several thousand dollars a year is not easy, could not one-time settlement.
□ reporter Chen Wei


a Fuyu Hu Yuan Dianqi road before. For the repair to the people In recent years, due to ask for projects to no avail, he was dragged on mental and physical fatigue,ghd midnight uk, has become a real poor households.
Yuandian Qi said, according to the reimbursement rate, Hu Village Government must also complete more than 20 million project, will probably take several decades.
相关的主题文章:


16头野象吃光600余亩庄稼 村民趁机抢收

Two elderly people have been hit the continued Let

21岁歹徒半夜抢劫超市被近六旬老人制服

Powered by phpBB © 2001, 2005 phpBB Group